Correct installation is essential for reliable measurement and safe operation of a port intrinsically safe explosion-proof turbine flowmeter. Select a location with easy access, away from strong vibration, heat, and electromagnetic interference. The pipe must stay full of liquid, so install the meter in a horizontal or upward-flowing vertical section where air cannot collect. Keep the flow arrow consistent with flow. Provide at least 10D upstream and 5D downstream straight pipe; use a flow straightener if space is limited. Use concentric reducers and avoid mounting directly after valves, elbows, pumps, or tees. Support the pipe independently to prevent stress on the meter. Use compatible gaskets and tighten flange bolts evenly to avoid leakage and distortion. For explosion-proof and intrinsically safe applications, bond the meter body and pipe to the plant grounding system. Route intrinsically safe circuits in dedicated shielded cable, keep them away from power cables, and connect them through a certified safety barrier or galvanic isolator. Do not change cable length or barrier model without approval. Seal cable entries and keep the enclosure closed. After installation, check wiring polarity, insulation, and grounding, then perform a leak test. Fill the pipe slowly, remove trapped air, and verify zero flow and signal output before commissioning. During maintenance, isolate the circuit and follow hazardous-area procedures. These steps ensure accurate measurement and long-term safety.

Water Conservancy Corrosion-re
Sewage Treatment Waterproof Pr
Chemical Industry High-pressur
Mining High-temperature Pressu