Installing a waterproof crane and trolley in a sewage treatment material tank requires careful planning to ensure safety, corrosion resistance, and accurate movement. First, inspect the tank structure, confirm load ratings, and verify that all embedded plates and anchor points meet design tolerances. Mark centerlines and elevation references before lifting the crane components into place.

Position the main crane beam on the support brackets, align it with the tank axis, and temporarily secure it with clamps. Check rail span, levelness, and parallelism with calibrated instruments. Adjust shims until deviations meet the manufacturer’s limits, then tighten anchor bolts in a diagonal sequence.
For the trolley, clean the rail surface and install the end stops. Set the trolley on the rail, align its wheels with the track centerline, and confirm smooth travel without jamming. Connect the drive unit, brake, and cable carrier, keeping all seals and waterproof covers intact. Apply flexible waterproof sealant around penetrations and use corrosion-resistant fasteners.
After mechanical installation, test manual and powered movement, limit switches, and emergency braking. Run a no-load cycle, then a rated-load test to verify positioning accuracy and stability. Record alignment data, torque values, and waterproof inspection results. This method improves equipment life, reduces maintenance, and ensures reliable operation in humid, corrosive sewage treatment environments.
Gate Intrinsically Safe Explos
Bridge Crane Corrosion-resista
Crane Waterproof Crane and Tro
Overhead Crane High-pressure C