Installation begins with a site survey and risk assessment in the hazardous area. Confirm the Gate system rating, zone classification, and all local safety rules. Isolate power and follow lockout procedures before mounting any device. Install the positioning base station on a stable structure with clear line of sight. Keep the antenna away from metal obstacles, tanks, and strong electromagnetic sources. Use approved explosion-proof cable glands and intrinsically safe cabling throughout. Connect power and signal wires according to the official wiring diagram, then tighten all terminals firmly. Bond and ground the enclosure exactly as specified to control static and fault current. Install remote tags or sensors at planned intervals so long-distance coverage remains stable. Keep each device within the approved installation distance and avoid shielding by pipes, walls, or moving equipment. After wiring, check insulation, polarity, and loop resistance before closing covers. Seal all unused ports and verify that gaskets are clean and seated. On power-up, confirm self-test status, network communication, and tag identification. Calibrate reference points and test positioning accuracy along the full route. Record coordinates, signal strength, and alarm responses for each node. Complete commissioning with a functional test, including fault simulation and emergency stop interaction. Finally, document the installation, label cables clearly, and set a periodic inspection plan for safe long-term operation.

Mixing Station Silo Explosion-
Shield Tunneling High-temperat
Injection Molding Die Casting
Construction Machinery Bridge