Install the Port Hoist intrinsically safe explosion-proof turbine flowmeter only after confirming the hazardous-area classification and approved safety parameters. Select a straight pipe section with at least ten upstream and five downstream diameters, away from valves, bends, and pulsation sources; keep the pipe fully filled. Mount the meter in the flow direction shown by the arrow, use compatible flanges and gaskets, and tighten bolts evenly to prevent leakage and stress. Support the pipeline independently so the meter carries no weight or vibration. Bond the meter, pipe, and hoist frame to the plant grounding system with low-resistance connections; never use the intrinsically safe circuit as a ground path. Route IS wiring in separate trays or conduits, use shielded twisted-pair cable, and connect the shield only at the designated barrier or grounding point. Install associated apparatus outside the hazardous area, verify entity parameters, and keep cable capacitance and inductance within approved limits. Seal cable entries, inspect enclosures, and maintain explosion-proof integrity. After installation, perform insulation, continuity, and grounding checks, then calibrate zero and span. During commissioning, confirm no leakage, stable signal output, and correct totalization. Lock out energy sources before maintenance, use calibrated test equipment, and replace covers and seals correctly. Document loop checks, barrier ratings, grounding resistance, and calibration results.

Sewage Treatment Gate Waterpro
Cement Storage Tank High-press
Mining Silo Intrinsically Safe
Metallurgy Reaction Kettle Hig